A day after the GO is issued for survey of Palamuru, the GO 70 sanctioning Rs 3.03 Cr has been issued to kickstart work of the Jurala-Pakala project. The Irrigation Dept. awarded the project to prepare the Detailed Project Report and to entrust the survey work, on nomination basis to M/s. WAPCOS LIMITED.
The Jurala – Pakhala Flood Flow Canal is proposed from the foreshore of Jurala Project, Mahabubnagar District with sill level at (+)311.000M (at Jurala) to Pakhala Reservoir in Warangal district to feed the 700 no’s (approx) of enroute tanks situated in drought prone areas of Mahabubnagar, Nalgonda and Warangal districts of Telangana State during flood season in 35 days by diverting 24,000 cusecs for total 70.00 TMC.